Archive for February, 2008

Neat Bathroom Sign

We like this for the bathrooms…

…just another random idea, brought to you by your friends at Ikea.

ikea_21.jpg

Update: I just realized that the women is significantly taller than the man. I guess that’s how they grow them in Sweden.

Tags: , , ,

Friday, February 29th, 2008 Cool Ideas No Comments

More Door Ideas

So I was playing in SketchUp again. Here are a couple other ideas for doors. the glass for #1 is about $60 per door, the glass for #2, #3, #4 is about $10 per door because they are stock sizes.

I kinda like #3?

picture-5.png

Update: Turns out the glass I found is only 1/8″ thick, so we’re back to option #1.

Wednesday, February 27th, 2008 Construction, Cool Ideas No Comments

Office Space Renderings

Here are a few pics I drew up for our new space. I used Google SketchUp to re-create the space off of the PDFs that Jeff Bogart sent. It was pretty easy to trace out the floor plan to get a better feel for the space.

It’ll be interesting to see what things look like in ‘real life’ versus the renderings.

I know that it is a little different than the plans, but I wanted to see how many people we can fit in there before we have to tear down that wall and add more space. Turns out…15 is the magic number.

Monday, February 25th, 2008 Construction No Comments

Door Issues and Ideas

So I learned yesterday that the doors we ordered were a LOT more than the original quote. It’s a long story, but I was asked if we could find something else. While talking to Fred, we came up with the idea to take solid-core slab doors and mill a window into each one. That’d save us a few bucks on each door, and give us the opportunity to do something real cool with our own design.

I cracked open SketchUp and I was off to the races. Here’s what I came up with.

picture-9.png

As it turns out, it’ll work! the Per-Door cost is a bit more, but we save enough on the entry doors to off-set the difference.

Monday, February 25th, 2008 Construction, Cool Ideas No Comments

Final Floorplan!

Here it is…the moment you’ve all been waiting for. (Not really, I know…it’s not your office.) This is our final floor-plan for 4403C…aka: The SparkBase Offices.

picture-11_0.png

For those of you out there with no vision, I’ll post a few renderings later in the week.

Hammers start swinging on Feb 25th!

Thursday, February 21st, 2008 Construction No Comments

General Contractor Time!

So one of the things that people don’t often think about when building an office…the General Contractor. (GC as they are known in the industry.) This is the person that you’ll need te rely on to make sure 3 things happen. (I like numbering things.)

#1: You stay on budget.
#2: The architect’s vision stays intact.
#3: You stay on budget.

Initially I called a guy that I trust not to steer me wrong. My good friend Leigh Weinberg. He’s got years in HVAC build-outs, and I figured he’d be able to point me in the right direction. I was right.

Leigh hooked me up with Fred Shafer. He was the first GC I talked to that didn’t cringe when I mentioned a budget. This is important…it’s my money on the line here! $20K over budget turns a $10.50-ft buildout into a $10.80-ft. When you are talking about 3,500-ish feet, and a 5-year lease, that all adds up.

So Fred is our guy, and he starts in a few weeks. He’s telling me it’ll take about 6-weeks to build everything out. We’ll see ow that works, but I’m cautiously optimistic that he’ll pull it off.

Welcome aboard Fred!

Sunday, February 10th, 2008 Construction No Comments